The gas deflector will be installed at the stern of the Odyssey Launch Platform, beneath the launch pad, replacing the structure that was lost during the launch attempt in January. Early in the recovery process, Sea Launch convened a special team to manage the fabrication and installation of the gas deflector. Specialized workers are using a Strand Jack hydraulic lift and pneumatic chain hoists for aligning the structure into position. Scaffolding around the launch pad area supports the workers in managing the assembly, lifting process and welding operations. First, they must put all of the support equipment in position. |
|
The Strand Jack can lift as much as 350 tons and is often used in the building of structures, such as bridges and buildings. It uses 40 cables (steel wires) within the system.
(Sea Launch photos by |