| At the Launch Site:
Upon arrival at the launch site, the launch platform is positioned
at 154 degrees West Longitude, ballasted to its launch depth and
oriented to minimize wind and wave effects. At L-27 hours prior
to liftoff, the rocket is rolled out of its environmentally protected
hangar and automatically erected on the launch pad.
Propellant chilldown begins at L-4 hours and 20 minutes, with
loading commencing L-2 hours and 30 minutes before liftoff. Launch
support personnel transfers to the assembly and command ship prior
to propellant loading. The large transporter/erector arm is lowered
17 minutes prior to flight, signaling all parameters are "go"
for launch. |